Difference between revisions of "NF2.1 Scheduler Variable Date Parameter"
From iDempiere en
CarlosRuiz (talk | contribs) (add info) |
|||
| (6 intermediate revisions by 3 users not shown) | |||
| Line 3: | Line 3: | ||
'''Goal:''' Technical | '''Goal:''' Technical | ||
| − | ''' | + | '''Developer:''' [[User:Hengsin|Heng Sin Low]] |
| − | + | '''Sponsor:''' [[Sponsor:Trek_Global|Trek Global]] | |
| − | ''' | + | '''Description:''' [[User:Chuckboecking|Chuck Boecking]] |
| + | This feature gives users the ability to schedule a process/report with variable date parameters. Doing so enables you to schedule and deliver reports via email or execute processes with current information. Here is an example Scheduler configuration using the Order Detail report/process. | ||
| + | |||
| + | [[file:iDempiere_report_scheduler_with_relative_parameters.png|600px|iDempiere Report Scheduler With Relative Parameters]] | ||
Rapid syntax : @#Date@+1d (for adding one day) | Rapid syntax : @#Date@+1d (for adding one day) | ||
| + | It is possible to use "d" for days, "m" for months and "y" for years. | ||
| + | |||
| + | If suffix is not added then days is assumed. | ||
| + | |||
| + | '''Technical Info:''' [http://idempiere.atlassian.net/browse/IDEMPIERE-1952 IDEMPIERE-1952] | ||
| + | |||
| + | [[Category:New Features|T]] | ||
[[Category:New Features v2.1|T]] | [[Category:New Features v2.1|T]] | ||
| − | [[Category: | + | [[Category:New Features Technical]] |
Latest revision as of 21:58, 7 August 2020
Feature: Run reports in the scheduler using context variables for dates
Goal: Technical
Developer: Heng Sin Low
Sponsor: Trek Global
Description: Chuck Boecking
This feature gives users the ability to schedule a process/report with variable date parameters. Doing so enables you to schedule and deliver reports via email or execute processes with current information. Here is an example Scheduler configuration using the Order Detail report/process.
Rapid syntax : @#Date@+1d (for adding one day)
It is possible to use "d" for days, "m" for months and "y" for years.
If suffix is not added then days is assumed.
Technical Info: IDEMPIERE-1952
